Select Your Region
The STERIS Certified Pre-Owned Reliance Vision Single Chamber Washer/Disinfector undergoes a precise refurbishing process. STERIS Certified Pre-Owned technicians thoroughly inspect and refurbish each unit to provide and ensure each Vision Washer/Disinfector is certified aesthetically and operationally to original equipment manufacturer (OEM) specifications.
Feature | Description |
---|---|
Instrument Cycle Time | 20 Min |
DIN Trays/Cycle | 24 |
Gallons Per-Cycle | 28 Gallons |
Spray-Arm Cleaning | Longer spray arms with broader spray coverage ensure no area is left untouched. High and low impingement washing options with dual speed 11.7 hp pump |
Preprogrammed cycles | The washer/disinfector is designed with five preprogrammed cycles (Instruments, Utensils, Plastic Goods, Gentle Cycle, and Ortho.) and one decontamination cycle |
Why STERIS CPO Reliance Vision Single Chamber Washer/Disinfector?
Disclaimer:
Product Image | Product # | Product Name |
---|---|---|
CPSTE7480 | Refurbished Two Level Manifold Rack | |
CPSTE7490 | Refurbished Three Level Manifold Rack | |
CPSTE7500 | Refurbished Four Level Manifold Rack | |
CPSTE7520 | Refurbished Five Level Manifold Rack |
|
CPSTE6170 | Refurbished Universal Transfer Cart |
|
CPSTE7710 | Refurbished General Purpose Rack | |
CPSTE6640 | Refurbished Rigid MIS Rack | |
CPSTE2180 | Refurbished Rack Dolly |
Disclaimer:
Our Certified Pre-Owned (CPO) STERIS Reliance Vision Single Chamber Washer/Disinfector undergoes a precise refurbishing process. STERIS Certified Pre-Owned technicians thoroughly inspect and refurbish each unit to provide and ensure each Vision Washer/Disinfector is certified aesthetically and operationally to original equipment manufacturer (OEM) specifications.
Diagnostics/Inspections
The STERIS process ensures that equipment operations and aesthetics meet STERIS performance and quality standards. The Vision Washer Certification Process restores equipment as an all-encompassing service.
Conditional Replacement/Refurbishment
CPO technicians ensure the equipment performance meets STERIS standards. This process includes a series of thorough system inspections.
Before and After CPO Refurbishment
Before:
Shown with outer panels removed before Conditional/Refurbishment
After:
Shown with outer panels removed post Conditional/Refurbishment